May 2012
The (old) studio. Double-doors lead to our dedicated parking spots.

May 2012
The (old) studio. Door in the middle leads to the stairs up.

May 2012
The (old) studio. Door in the middle leads to the stairs up.

June 2012
Entrances. 2 doors to the right are our unit(s).

July 2012
Shared entry gate.

June 2012
Entry staircase

June 2012
Old kitchen and entry

June 2012
Old entrance to upstairs unit

June 2012
Old kitchen. Notice kitchen fan with no exhaust.

June 2012
Old kitchen

June 2012
Panorama of old kitchen

June 2012
Old kitchen

June 2012
The old kitchen, bedroom (to be), living room.

June 2012
Living room (notice the sink in the middle)

June 2012
Old living room, with undersized space heater.

June 2012
Where the new bedroom will go!

June 2012
Old living room. Notice the lack of flooring.

June 2012
Old living room and bedroom.

June 2012
The ceilings we fell in love with.

June 2012
View of old kitchen and entrance.

June 2012
Old mezzanine space (former bedroom)

June 2012
Opposite view of mezzanine.

July 2012
Shared entry prior to landscaping.

July 2012
View of neighbors from balcony.

December 5, 2012
Making space for the framing of the new interior walls. First new appliances arriving.

December 5, 2012
Making space for the framing of the new interior walls.

December 5, 2012
New toilet in mezzanine bathroom going up temporarily.

December 5, 2012
Layout of the new closet. First boards installed!

December 6, 2012
Framing the new storage and bathroom in the studio.

December 6, 2012
Framing the new storage and bathroom in the studio.

December 6, 2012
Framing the new storage and bathroom in the studio.

December 6, 2012
Framing the new storage and bathroom in the studio.

December 10, 2012
Framing the (new) master bathroom.

December 10, 2012
Framing the new master bathroom.

December 10, 2012
Framing out the new master bedroom.

December 13, 2012
Jeff Wong, our contractor.

December 10, 2012
Framing the new master bathroom.

December 13, 2012
Last of the old kitchen cabinets being demolished.

December 17, 2012
Frame for the kitchen counter.

Dec. 19, 2012
Electric wires going in.

Dec. 19, 2012
Waste lines going inside the interior wall of the new bathroom.

Dec. 27, 2012
The new interior wall between kitchen and entry with all electrical, gas, water, waste lines.

Dec. 27, 2012
Laundry walls in mezzanine starting to come together.

Dec. 27, 2012
The new interior wall between master bathroom and kitchen with all electrical, gas, water, waste lines.

Jan. 7, 2013
The new tub finally going in.

Jan. 7, 2013
Demolishing the wall closing in the toilet, making the studio bathroom feel a lot bigger!

Jan. 7, 2013
New electric panel.

Jan. 10, 2013
New interior doors (exterior grade, fireproof) go in (with SOSS hinges!!).

Jan. 9, 2013
Waterproofing around the new bath-tub.

Jan. 11, 2013
The new interior wall between the bedroom and the living room.

Jan. 11, 2013
First sheetrock goes up!

Jan. 11, 2013
Noise/fire insulation going up in the bedroom.

Jan. 12, 2013
The new kitchen slowly shaping up.

Jan. 16, 2013
This will be a master bedroom, at some point...

Jan. 12, 2013
Insulation and sheetrock going up in the studio bathroom.

Jan. 17, 2013
Closing the wall between the mezzanine and the new master bedroom.

Jan. 17, 2013
The last open view from above of the closet in the new master bedroom.

Jan. 16, 2013
Insulating the walls in the master bathroom.

Jan. 17, 2013
Closing the wall between the mezzanine and the new master bedroom.

Jan. 17, 2013
Roxul safe & sound noise and fire insulation going inside the new interior walls.
Jan. 2013
Finally mezzanine and bedroom are separate rooms!

Jan. 26, 2013
Patching starting in the master bedroom closet.

Jan. 26, 2013
Kitchen all ready for the cabinets!

Jan. 26, 2013
The first kitchen cabinets is up!

Jan. 26, 2013
Our living room, for months now...

Jan. 28, 2013
Kitchen cabinets finally going in!

Jan. 28, 2013
Kitchen cabinets finally going in!

Jan. 30, 2013
Vanity in master bathroom going in.

Jan. 31, 2013
Measurements for the kitchen countertop.

Jan. 31, 2013
Kitchen cabinets in, installing plywood in preparation of stone countertop.

Feb. 2013
New Silestone White Zeuss counter in the kitchen

Feb. 2013
Patching the new walls, studio bathroom

Feb. 2013
Patching the new walls, lot's of fine dust...

Feb. 2013
Patching the new walls

Mar. 1, 2013
Painted closet door

Mar. 1, 2013
Installed new light fixture by entrance

Mar. 1, 2013
Installed new kitchen sink

Mar. 1, 2013
Installed new interior door levers

Mar. 1, 2013
Installed control for external tankless water heater

Mar. 1, 2013
Started install of new closet shelves, new lights

Mar. 5, 2013
New window in master bathroom

Mar. 5, 2013
New Tolomeo reading lights in bedroom

Mar. 5, 2013
Closet almost ready!

Mar. 5, 2013
Our new sexy dimmers

Mar. 5, 2013
New bedroom door

Mar. 5, 2013
Microwave installed

Mar. 5, 2013
First wall tile in the master bathroom!

Mar. 6, 2013
Bathroom glass tiles going up.

Mar. 9, 2013
Balcony furnituyre arrivives.

Mar. 9, 2013
Lights and shadows on our new walls.

Mar. 9, 2013
Installed new wine bottle holder

Mar. 13, 2013
Taking out the old ceiling fan

Mar. 15, 2013
Starting tiles in the kitchen

Mar. 17, 2013
Bathroom wall tiles almost finished

Mar. 18, 2013
Ready for the new toilet

Mar. 18, 2013
Kitchen tiles complete

Mar. 18, 2013
New ceiling fan. Notice cheap wood on ceiling prior to painting.

Mar. 20, 2013
Finally the new range in place. Cabinets in, but still no pulls.

Mar. 20, 2013
Master bathroom sink and prep for mirror

Mar. 20, 2013
The new fridge in place

Mar. 22, 2013
Installed first tiles of new vertical planter on kitchen wall.

Mar. 22, 2013
Pulls on kitchen cabinets

Apr. 2013
The first plank of the new Tigerwood floors in the living room (with rubber underlayment)

Apr. 2013
Self-leveling mortar to flatten the floor

Apr. 2013
Self-leveling mortar to flatten the floor

Apr. 2013
Removing the old leaking french doors to the balcony

Apr. 2013
Hardwood floors being manually sorted by color and installed in living room

Apr. 2013
Direction change in hardwood floors by the kitchen

April 2013
Bedroom is done!

April 2013
Seonok and our friend Mikaela testing the new kitchen

April 2013
Rubber flooring being installed in the studio

April 2013
Rubber flooring on old entry staircase (the first step!)

April 2013
Rubber flooring being installed in the studio. Yes, that is what I had to work around for months!

May 2013
New shelving in the studio storage room

May 2013
Starting the new wall to wall bookshelf in the living room
June 2013
Living room bookshelf coming together, with very uneven walls...
May 2013
Living room bookshelf coming together.
Aug. 2014
Picking Moroccan light fixture for the master bedroom.
Dec. 2013
Our first fan!
Dec. 2013
First Christmas tree!
Jan. 2014
New studio windows
Jan. 2014
New studio windows
Feb. 2014
Fabric for mezzanine divider curtain arrives from India.
Mar. 2014
First broken tile!
July 2013
Living room light fixture arriving, half of them broken.

2014
A new logo is born!
Nov. 2014
First CREATE Space promo

July 2014
Removing old rotten balcony railing

July 2014
Preparing for new balcony flooring

July 2014
Preparing for new balcony flooring

July 2014
Preparing for new balcony flooring

July 2014
New balcony flooring

July 2014
Welding new balcony railing.

July 2014
First corner of new iron balcony railing ready!

July 2014
New balcony railing being installed.

July 2014
New balcony railing being installed.

July 2014
New balcony railing being installed.

July 2014
Balcony railing done!

Aug 2014
First location photos

Aug. 2014
First location photos for HOUZZ feature.
Nov. 2015
First formal dinner event.
Jan. 2016
Scaffolding to paint ceilings
Jan. 2016
Preps to paint interior ceilings.
Jan. 2016
Sealing big open gaps in the ceiling
Jan. 2016
Back in construction mode...
Jan. 2016
Ceiling patching and painting complete, new double plexi under skylights installed.
Apr. 2016
New opening window in living room.
Apr. 2016
New insulated window in living room
Apr. 2016
Last view of old leaking window.